Many, it should be conveyor design, manufacturing, installation commissioning, use and maintenance to begin to solve the tape deviation, such as the tightness of the tape on both sides of the tape on both sides of the high and low not because of the factors that cause the belt run vertical cross-section upper roller stents and other devices are not installed with the tape running direction will cause the belt deviation. Treatment process: 1, Adjust the tension institutions act. When the tape is running, in case of no-load and overload deviation to the same side, indicating the tightness of the tape on both screw conveyor for sale sides is not the same can adjust the direction shown in Figure A; tape about deviation and no fixed direction , the the tape slack should adjust the tension institutions. Adjusting the roller method. If the tape is the deviation in the drum at the the drum installation owed level of, drum axial movement, or the one end of the former one end of the drum in the post. At this time, horizontal and parallel degree of the drum should be corrected. Adjust the roller bracket (or rack) act. If the tape is in a no-load total deviation to the side, you should run the laterality of the idler bracket along the tape running direction forward 1-2cm (see Figure B), or the other side of the roller bracket (or rack ) appropriately heightening. Removal of sticky material law. Stick on rollers, idlers local materials, where the diameter will increase, leading to where the tape tension increased, resulting in the deviation. Should promptly clean up the adhesive material. Adjust the gravimetric method. If the tape is not wandering concrete plants for sale in the no-load the overload total deviation to the side of the tape is the partial load. Should be adjusted to the location of the receiving hopper or tape machine, tape, are contained to prevent deviation. Adjustment tape method. If the tape edge wear serious or the tape seams not parallel, will allow both sides of the tape tension inconsistent. Should be trimmed back or replace the tape. Install the tune partial roller. Several groups concrete mixer for sale of self-aligning roller (the flat roller or groove roller) installed on the conveyor, that can portable concrete plant automatically correct the deviation phenomenon of the tape. Example: when the belt deviation and the one side retaining roller friction, so that the side of the concrete planetary mixer bracket along the running direction of the tape forward, the other side that is relatively moved backward, move the tape will toward The stopper roller side of the movement, until the return to the normal position. Install limit roller method. If the tape is a total deviation to one side, ran laterality rack installation limit vertical roll; so, on the one hand allows the tape to force mandatory reset the other hand, the vertical roll to reduce run laterality tape pull, so The tape is moved to the other side. The aggregate feed door block off material. Failure phenomenon: batching station concrete trailer pump stone feed pneumatic door stones stuck not open. Analysis: batching station pneumatic door there is a big gap doors and small gap doors, big gap door its clearance greater than normal gravel particle size, so as to avoid the card material.
Forced households concrete mixer is mixing station ready mix concrete plant using mainstream, it can be a variety of concrete stirring fluidity, semi-rigid and dry hard. Free fall mixer stirring fluid
JZC concrete mixer. JZC concrete mixer feeding systems and chassis. JZC type concrete mixer type they use a tipping bucket on the feeding system. To control the rise or fall of the hopper by bucket tr
Blenders the main small concrete mixer motor fixed. Failure phenomenon: press the the operation stage mixer start button, the mixer does not start. Analysis: 1, air compressor does not start or the pr
near the tension roller to adjust the drive rollers, the wrapping angle of the belt on the drive rollers is increase concrete plants manufacturerd, increasing the friction. 3, cut straight groov
Its small gap door gap is generally in the 5 ~ 10mm, 10mm below the stones card into the gap, it is difficult to pneumatic door jammed. Batching station after a period of use, the aggregate diesel eng
Cement, fly ash powder by the screw conveyor is transported to the weigh hopper metering, using imported Italian bucket of discharge butterfly valve, sealed tight, reliable action. Water and liquid ad
The repair method fast Installation concrete mixing plant is the disintegration of the solenoid concrete mixer for sale valve, clean diesel parts clean and dry with a clean cotton yarn and coated with
Compulsory mixer structure is divided into the main planetary mixer, a single horizontal shaft concrete mixer, twin-shaft concrete mixer. Particularly the comprehensive use of concrete plants the twin