|
Mobile Air Conditioner Mould
|
|
* Manufacturing moulds of air conditioner.* The main plate is employed P20.* The delivery time is 60 days after receiving 40% down payment.* The mould packaging is adopted wooden box.
|
| |
Paint Barrel and Cover Mould
|
|
* Manufacturing moulds of paint barrel and cover.* The main plate is employed P20.* The delivery time is 60 days after receiving 40% down payment.* The mould packaging is adopted wooden box.
|
| |
Plastic Cup Mould
|
|
* Manufacturing moulds of plastic cup.* The main plate is employed P20.* The delivery time is 60 days after receiving 40% down payment.* The mould packaging is adopted wooden box.
|
|
|
Plastic Pipe & Fitting Mould
|
|
* Employed 45#/P20 steel for the mould.* The delivery time is 60 days after receiving 40% down payment.* The mould packaging is adopted wooden box.
|
| |
PP Preform Mould & Bottle
|
|
* The king preform is 5 gallons (19kg) bottle, and the weight of preform is 650g to 750g.* Home water is adopted 3 gallons (12kg) bottle, and the weight of preform is 300g to 520g.
|
| |
Product Collection and Mould
|
|
* Manufacturing moulds of all kinds of preform/cap/handle.* The mould are employed Germany HOTSET Coil Heaters.* All cores and cavities are employed 2316 stainless steel, and the main plate is employe
|
|
|
Semi Automatic PET Stretch Blow Moulding Machine
|
|
* Direct pressure pneumatic hydraulic locking mold system makes a steady mold locking;* Imported high pressure blowing valve and Mitsubishi programmable controller are flexible and precise.* Open and
|
| |
Semi Automatic PP Stretch Blow Moulding Machine
|
|
* Direct pressure pneumatic hydraulic locking mold system makes a steady mold locking;* Imported high pressure blowing valve and Mitsubishi programmable controller are flexible and precise.* Open and
|
| |
Turnover Box Mould
|
|
* Employed 45#/P20 steel for the mould.* The delivery time is 60 days after receiving 40% down payment.* The mould packaging is adopted wooden box.
|
|