Russian German French    |    help
   Add to favorite    Favorite products
   
Description
Industrial Equipment /  Construction Equipment /  Construction Machinery / 
Send Request

about this service

Producer information
Company:
Zhengzhou Dayu Concrete Machinery Co., Ltd.
 
Address:
No.18, Dongfeng Road, Zhengzhou, Henan, China.
 
Phone:
+86-371-55639099

trailer pumps electric concrete pump for sale


 near the tension roller to adjust the drive rollers, the wrapping angle of the belt on the drive rollers is increase concrete plants manufacturerd, increasing the friction. 3, cut straight groove in the drive drum on the packet layer to increase the coefficient of friction. 4, electric concrete pump for sale such as the first three methods can not solve, you need to replace the non-slip concrete mixing plant for sale roller. Admixture can't pump on. Failure phenomenon: admixtures pump can't pump on admixtures. The reasons: 1, the admixtures pump bubbles. 2, admixtures box materials. 3, the admixtures pump impeller damage. Process: 1, apart admixture vent screw discharge bubbles in the admixture. Add to admixtures box admixtures. 3, check the the admixture impeller situation, as the case of replacement parts. Belt damage. Failure phenomenon: use one end of the time, the belt electric trailer pumps surface degumming, cracking, scratches and other phenomena. Analysis: metal belt cleaning if not timely adjust, easy to damage the belt, causing the belt surface rubber off. The sweeper is not installed correctly, the sharp gravel cards will damage the belt between the sweeper. The poor quality of the belt itself, are also prone to the above-mentioned defects. Process: Once the belt degumming, cracking, scratches and other defects should be promptly repaired. When the belt injury, we must first solve the factors causing belt damage, such as damage to the sweeper, you need to immediately adjust or replace the sweeper, then promptly repair the belt. Belt damage is very small, can belt repair glue-site repair. When and belt damage surfaces or severe local damage to local damage belt cut away, the replacement period of belt vulcanizing machine cementation. Belt injury is not promptly treated, the damage spread to the entire belt, no repair value, only the entire replacement. Belt conveyor aggregate uneven. Failure phenomenon: aggregate unloaded onto the belt material accumulation, resulting in the bulk material belt or belt conveyor aggregate vacancies caused pebbles scattered material. Analysis: ingredients the station variety of aggregate unloading belt sequence and time interval can be arbitrarily adjusted at any time. General discharge order requires the last unloading the aggregate for the the sand unloading time interval required for the former hopper lift concrete plant for sale aggregate falls on the belt tail just coincidence fell on the belt on the head with the latter aggregate. Such as the time interval is too short, then the former aggregates with the latter aggregate overlapping Stockyard Stockyard too much will cause the bulk material, such as the time interval is too large, then the two aggregate there is portable concrete batching plants space in the middle, the former If the material is gravel, is wallowing in the belt and fall down. Treatment process: Adjust aggregate discharge order, ensure the sand for the last discharge. 2, according to the distribution of the aggregate in the belt to adjust a variety of aggregate time for unloading interval to ensure that belt material on the continuous, uniform distribution. The interval normally takes several adjustments. Concrete mixing plant troubleshooting method nine, can not adjust the pressure relief valve pressure gas source FRL. Failure phenomenon: rotation reducing valve hand wheel adjustment, but the pressure can not be adjusted. Analysis: 1, pressure reducing valve import and export orientation install anti. 2 sliding parts embedded foreign body or spool, spool of a foreign body stuck. 3, the regulator spring, the return spring, the diaphragm, the spool on the ready mix concrete plants supplier rubber pad damage. Process: 1, check the pressure relief valve import and export for the correct orientation. 2, break up the check valve core and related parts and clean up debris on parts. 3 parts damaged, replace the pressure relief valve. Gas source FRL lubricator drop of oil or drip volume is too small.

Add to BasketAdd to Basket Web addressWeb address



Other goods of this manufacturer :
twin shaft concrete mixer diesel concrete pump
twin shaft concrete mixer diesel concrete pump (twin shaft concrete mixer diesel concrete pump)
Its small gap door gap is generally in the 5 ~ 10mm, 10mm below the stones card into the gap, it is difficult to pneumatic door jammed. Batching station after a period of use, the aggregate diesel eng
diesel concrete mixer concrete station
diesel concrete mixer concrete station (diesel concrete mixer concrete station)
Cement, fly ash powder by the screw conveyor is transported to the weigh hopper metering, using imported Italian bucket of discharge butterfly valve, sealed tight, reliable action. Water and liquid ad
diesel motor concrete mixer mini concrete mixer
diesel motor concrete mixer mini concrete mixer (diesel motor concrete mixer mini concrete mixer)
The repair method fast Installation concrete mixing plant is the disintegration of the solenoid concrete mixer for sale valve, clean diesel parts clean and dry with a clean cotton yarn and coated with
mobile concrete plant vertical planetary concrete mixer
mobile concrete plant vertical planetary concrete mixer (mobile concrete plant vertical planetary concrete mixer)
Compulsory mixer structure is divided into the main planetary mixer, a single horizontal shaft concrete mixer, twin-shaft concrete mixer. Particularly the comprehensive use of concrete plants the twin
modular concrete plants movable concrete mixer for sale
modular concrete plants movable concrete mixer for sale (modular concrete plants movable concrete mixer for sale)
Outside corollary equipment. By sea, air, road, silo Concrete Mixing Plant Model: HZS60, HZS75 portable concrete plants, HZS90, double HZS90, HZS120, double HZS120, HZS180. Concrete Mixing main models
movable concrete plant cement mixing machine
movable concrete plant cement mixing machine (movable concrete plant cement mixing machine)
The closed form of belt conveyor, the lower part of the overflow outlet, can effectively prevent and gravel strewn. The belt conveyor with heavy vertical tension structure, eliminating the adjustment
movable concrete plant concrete batching plant
movable concrete plant concrete batching plant (movable concrete plant concrete batching plant)
Before the operations, should be checked and corrected indication of the water supply system consistency of water, and the actual amount of water; pipeline leakage point when the error is more than 2%
planetary concrete mixer concrete mixing equipment
planetary concrete mixer concrete mixing equipment (planetary concrete mixer concrete mixing equipment)
Gas system maintenance. The air compressor concrete mixers in china is the main body of the gas source means and having a very important role in the gas system. Therefore, to do well in the use of the
portable concrete plant concrete mixer
portable concrete plant concrete mixer (portable concrete plant concrete mixer)
Many, it should be conveyor design, manufacturing, installation commissioning, use and maintenance to begin to solve the tape deviation, such as the tightness of the tape on both sides of the tape on

Likewise in category "Construction Machinery":
Keypad Series
Keypad Ser...
Keypad Series
Keypad Ser...
LAN Series
LAN Series
LAS4 Series
LAS4 Serie...
Two Way Draining Board
Two Way Dr...
Aluminum Hydraulic Cylinders
Aluminum H...
 
Copyright © 2006 - 2011 Asia.ru
 
eHouseHolding.com